Our trial operation has been successfully completed at MOL in Tiszaújváros after a 6 month long testing period of the sewage treatment plant that we had planned and constructed. Now the plant area is free of hazardous and toxic gases (BTEX), hence wastewater treatment can take place under the most secure conditions and at high health and safety standards, safeguarding the wider environment as well.