By complete reconstruction of an existing obsolete plant, we realised a modern WwTP including mechanical pretreatment, rain water treatment, cyclic biological stage, sludge dewatering.
Capacity: 2.500 m3/d (11.300 PE). As the technological member of a joint venture, our scope was:
Authorisation and detailed planning, supply and installation of all technological and electrical units; management of trial operation.