By reconstruction and extension of an existing obsolete plant, we realised a modern WWTP including a new cyclic biological stage.
Capacity: 1.650 m3/d (14.593 PE).
As the technological member of a joint venture, our scope was:
Authorisation and detailed planning, supply and installation of all technological and electrical units; management of trial operation.