December, 2008 – 22th June, 2009. Our company as the main contractor, erected an all new wastewater pre-treatment plant for Danone Ltd. The main designing data are: 1390 m3/d dairy wastewater, 2730 kg/d KOI load. Technology: drum screen; chemical flocuation- flotation and a 3000 m3/h capacity biofilter.