By green field investment we realised a modern plant including new mechanical pre treatment, cyclic biological stage, sludge dewatering.

Capacity: 2.226 m3/d (16.666 PE).

As the technological member of a joint venture, our scope was:

Authorisation and detailed planning of the WwTP supply and installation of all technological and electrical units; management of trial operation.