By complete rebuild of an existing obsolete plant we realised a modern WwTP including new mechanical pre treatment, rain water treatment, cyclic biological stage, sludge dewatering and many other installations, buildings.
Capacity: 2.300 m3/d (~24.000 PE).
As leader of a joint venture, Inwatech’s scope was:
Authoriszation and construction planning, supply and installation of all technological and electrical units; management of trial operation.